Information
Digital ID
upr000062-055
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.YEAR END INVESTMENT OF LOS ANGELES AND SALT LAKE RAILROAD COMPANY IN WATER PRODUCTION FACILITIES AT LAS VEGAS FOR YEARS 1938 TO 1950, INC. INVESTMENT PRINCIPAL YEAR DECEMBER 31ST IMPROVEMENTS 1938) $ 210,^35 Pipe line extensions 1939) 218,650 and replacements 19^) 21+9,1+0^ Wells 3 and b 19*+1) 28^,772 Pipe line extensions 19^2) and replacements Wm M+0, 8M+ Power lines 19W >*7,797 Wells 5 to 10 Settling Basin No. 2 19^5) 503,787 Pipe line extensions 191+6) 765,192 Well No. 11 19^7) 766,806 Settling Basin No. 3 Reservoir No. 2 Power lines 19W) 773,150 Pipe line extensions 19^9) 795,312 Booster pump house 1950) 792,876 (Includes 679*2 acres of land) Prior to 1950 1 investment. ,230,7^ acres of land were included in plant