Skip to main content

Search the Special Collections and Archives Portal

upr000062 40

Image

File
Download upr000062-040.tif (image/tiff; 26.85 MB)

Information

Digital ID

upr000062-040
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    t >©net mrnmm Wm* Reinhardt, Vice President, devotes & substan­tial portion of Mo time % the production of water and It io conservatively estimated tho annual espenee amounts to f4#jfe4i®,®» plua x^aroentages or total of Engineering expense Isaurred tgr Industrial Engineer, Adamson, and Assistant dialing X9&9 for improve- moots and rehabilitation of water produotlon faolli- ties amounted tot As a considerable portion of this expense was Incurred designing a booster plant and that portion of the transmission mains to Bonansa Village, to he oonstruotsd by the Railroad Cfcmpany, and considered as a pss rsourring project, it was conservatively estimated the 1950 would be approximately 25# of the 19b9 expense, or a total of 1720 per annun* Du# to investigation to determine beet method of increasing production and to rehabilitation and well ©leaning expense, the 1950 east amounted tot Xn addition, Aset* Industrial Engineer Haag expended following in preparation of physical inventory of the property* ^nmineeMng Ind* W&0P* Assistant total fine Xnd* Engr. Assistant fetal Time Expenses ?b flat SKpsoMt Total ^tgiassring 39^*58