Skip to main content

Search the Special Collections and Archives Portal

upr000062 31

Image

File
Download upr000062-031.tif (image/tiff; 26.68 MB)

Information

Digital ID

upr000062-031
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    saeqaiiftaK flee President, Wm* Reinhardt, devoted a substantial part of Me time to the affairs of the Water Oospauf .and it la conservatively estimated the catenas amounts to S»125 per annum* $1,12. i&adLaaarl*ue |=||| Engineering expense inourred by Industrial Ifcgineer Adamson and Asst. Industrial Engineer ' mm during %P0 in p1*mn*ng slid SUg arviSiag i&gmaftmmm and rehabilitation work incident to water distribution amounted tei During ifjl subdivision development continued at an accelerated rate and in addition several large projects were undertaken! 1* Downtown transmission main in alley south of Fremont St* a* ^tension of Transmission Main in Stewart St* 3* Construction of new shop and ftarage Mdf* &• Inventory of entire distribution system* all of which required considerable engineering, office and drafting scenes and as a result, the ifjp aspens# Incurred incident to StM 1 to 3 Inclusive amounted tot H* L* Adamson L* 1* Haag Total m&i&mk* ____*. Time Suspenses |2fJ*fa H,192*§D 2nd* ingr® Assistant Total Adamson . . Time wmm&m and Item % Tims Expenses m»td2*8k Total Engineering