Information
Digital ID
upr000062-026
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.m MmXM Vice President, Wm, Heinfc&rdt, devoted a substantial »*n of his time to the affair# of the Water Company Engineering expense Incurred by Industrial Sngineer and Asst. Industrial Engineer Maag daring 19&9 In planning end supervising improvement and r ehaMIi t&tlen wsi& incident to water distribution amounted tot During 1950 subdivision development continued at an accelerated rate and in addition several large projects were undertaken? 1* Downtown transmission main In alley south of Fremont St, i* Extension of Transmission Main in Stewart St* !• Const motion of new Shop and garage h* Inventory of entire distribution system, all of which required considerable engineering, office and drafting expense And as a result# the 1950 expense incurred incident to items 1 to I inclusive amounted to: Tins i&epense* E, l», Adana on #395*9* nag. Ind« Engr. Assistant Total Tins and tt#» k Tine ^penaes 123.9.3 ...183.32 tt.262.8* Total Hnglnearlng