Skip to main content

Search the Special Collections and Archives Portal

upr000062 23

Image

File
Download upr000062-023.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000062-023
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Wa« Reinhardt, Vies President, devotee n substan­tial portion of m$ time to the production of water and it i« oonserv&tivsiy estimated the annual expense amounts to #1,030.^1, plus percentages or Engineering expense incurred by Industrial, Engineer, Adamson, and Assistant Haag during 19&9 for i»prev#~ ment* and rehabilitation of watar production facili­ties anointed tot As a considerable portion of this expenst was incurred designing a booster plant and that portion of th# transmission mains to Bananas Village, to bo constructed by till Railroad Company, and considerod at a non recurring project, it was conservatively estimated the 1950 would bo approximately |gg of tho 19^9 essence, or a total of ff20 per annus* Poring the year 1950, however, several unanticipated projects developed! 1* Construction of pipe line to divert water from Well He* 8 to the Oharleaten Reservoir. a. axfaninil rehabilitating and testing ? INdls 8, 9, 10 and 11, in effort to inore&es production. 3. Investigation of pumping equipment for Wells 8, 10 and 11 to increase production. b* Staking study of pumping plant and preparing layout for connection to servo the Westleigh Addition on West Charleston Blvd. 5. Raking physical inventory of production facilities and transmission mains. as a result of which engineering expense incident to Item* 1 to % inclusive incurred during 1950 amounted tel H,125.00 .la^lacerlafg. md. mgr. Assistant fetal. Adamson... flat