Information
Digital ID
upr000050-170
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Estimated to construct approximately 1600’ 12” C.I. Line from proposed new well to settling basin, make connection to well, tee.valve and cap same, construct concrete well box, as follows: 1600' 12” 0.I.Pipe $3,000.00 Excavate backfill 300.00 Lay pipe 175.00 Haul pipe 60.00 Unload pipe 20.00 Make concrete well 225.00 Concrete well box 150.00 3,930.00 Plus contingencies 300.00 #4,230.00 J. M-J Anders an 6-27-35