Skip to main content

Search the Special Collections and Archives Portal

upr000048 149

Image

File
Download upr000048-149.tif (image/tiff; 25.45 MB)

Information

Digital ID

upr000048-149
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    strue ted daring 1927, or concrete reservoir, which will toe oon- etrueted this year. It should also toe borne in mind that it is proposed to install 24” east iron pipe line next year which will farther increase the annual charges. Should consideration toe given to increasing rate charged for water in las Vegas townsite whieh, at the present time, varies from $0.50 to $6.00, as set forth in las Vegas land and Water Company's Form 14 covering water rates, then necessity for appearing before Sevada Public Utilities Com­mission and the probable aotion that will toe taken toy that body should toe considered. It is my understanding that conference will toe held between officers of the Eailread Company and las Vegas land JKs. and later Company with a view pf determining a fair rental for the use of the Bailroad Company's water facilities, and the above information is intended to facilitate that determination. B. 1. Adamson