Skip to main content

Search the Special Collections and Archives Portal

upr000047 117

Image

File
Download upr000047-117.tif (image/tiff; 26.61 MB)

Information

Digital ID

upr000047-117
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 The Railroad is willing to construct said User's connection and furnish the User sufficient water for User's requirements from such surplus water as it may have available from such source beyond the needs and requirements of railroad uses at its Las Vegas terminal, and such other uses as the Railroad has heretofore agreed to supply, on the following terms and conditions: XT IS THEREFORE AGREED: I. The Railroad shall at the sole cost and expense of the User, install, maintain and remove User's connection consisting of ______ inch meter and pipe of __________ inch diameter and __________ feet in length, required for service to the User under this contract, and shall sell and supply to the User through said User's connection such surplus water as the Railroad may have available at Las Vegas beyond its said needs and requirements, at the price and rate of 13^ for each 100 cubic feet of water up to 800 cubic feet; and 10$? per 100 cubic feet far all water furnished in excess of 800 cubic feet, with a minimum charge of $2.50 per month* II. The User shall pay to the Railroad, before any work on installation is begun, the cost of User's connection hereby fixed at $___________, and upon presentation of bills therefor shall pay to the Railroad all expense incurred by it in the maintenance and removal of said User's connection,