Skip to main content

Search the Special Collections and Archives Portal

upr000044 12

Image

File
Download upr000044-012.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000044-012
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las Vegas - August 16, 1951 (cc - Mr* Wm. Reinhardt According to August lh, 1951, Daily Reports of Well Operation at Las Vega3, we had a power failure at 8;20 P*M*, as a result of which the pump motor on Well No, 10 was burnt out* As you know, this is our most productive well and as a result we have been short of water all day and at the present time 8,45 P*M* D.3*T* - August 15* 1951 - both pumps are off at the Charleston Reservoir and we are carrying only 2# pressure at the Clark St* Reservoir, It was necessary to appeal to the public by radio to eliminate sprinkling this afternoon and evening in order to reduce consumption to a minimum, but with this reduction, consumption has exceeded our curtailed production, I I am advised the power trouble was caused by a blown fuse on the Power Company side of the 3-pka.se circuit to the substation serving the Railroad Company facilities which single phased our operating circuit and resulted in the burnt out motor. Mr* P. G, Martini