Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
D. SUMMARY OF MATERIALS ^ NOTES: 1 Site facilities means those within the boundaries of the housing project including those in streets or easements where they bound the project. 2. Approach facilities means those which are not within the boundaries of the easements where they bound the project. Abbreviat ions: DU - Dwelling Unit l.f. - linear feet IWater FacilitiesI Service DU per service__l_Size of DU per service_____Size of DU per service_____Size of Total services: Number___ service 5/Mr. service____No. service____No. _1_______l.f. per services services services service ioi Mains ? Si te ? Site ? Site .. ? Site Site pi ? Approach size ? Approach size ? Approach size ? Approach size approach .... Fire Hydrant Weight of all cast iron in proposed facilities ......... Weight of all steel in proposed' facilities............. Total cost of all materials in proposed facilities . . . iGas Facilities! ? Cooking DTlot Water ? Space Heating Service DU per service_____Size of service_____No. services------ DU per service_____Size of service____No. services------- DU per service_____Size of service____No. services------- Total services: Number_____________l.f. per service------ Mains ? Site ? Approach Pressure Size ? Site ? Approach Pressure Size ??.-•Si te ? Approach Pressure Size ? Site ? Approach Pressure Size Site plus approach .... ................ Weight of all cast iron in proposed facilities ......... Weight of all steel in proposed facilities ............. Total cost of all materials in proposed facilities . . . Electric Facilities ? Light ? Refrig. ? Cooking d H.W. Si ze l.f. Copoe r Secondary Size l.f. Coppe r Primary Approach Size l.f. Copper Site Size l.f. Coppe r Si ze 1. f. Steel prounds Size l.f. Coooe r Weight of copper conductors proposed facilities Trans formers Approach No. Total Capacitv . Site No. Total Capacitv . Street Lighting Wire Size l.f. Copper Steel Street Lighting Fixtures .................... ........................... Constant Current Transformers No.---------Total Capacity •........... Total cost of all materials in proposed facilities . . . I Sewer Facilities ? Storm ? Sanitary Approach........... . . Site ............. • ? Combined Weight of cast iron in proposed facilities . . . Total Cost of all materials in proposed facilities housing project and not in streets or QUANTITIES REQUIRED UNIT PER DU TOTAL l.f. XXX _____________ 1. f. XXX l.f. XXX 1. f. _1CL'~ l.f. XXX l.f. XXX l.f. XXX 1. f. XXX l.f. No. XXX lb. 0 lb. 0 $ XXX 5.00 1. f. XXX 1. f. XXX l.f. XXX l.f. 1. f. XXX l.f. XXX l.f. ' XXX l.f. XXX l.f. lb. lb. $ XXX lb. XXX lb. XXX lb. XXX lb. XXX ___________________- lb. XXX ________________________ lb. XXX lb. kva kva lb. XXX lb. XXX No. XXX kva XXX $ XXX l.f. 1. f. lb. $ XXX