Skip to main content

Search the Special Collections and Archives Portal

upr000043 76

Image

File
Download upr000043-076.tif (image/tiff; 29.06 MB)

Information

Digital ID

upr000043-076
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    D. SUMMARY OF MATERIALS f NOTES: 1. Site facilities means those within the boundaries of the housing project including those in streets or easements where they bound the project. 2. Approach facilities means those which are not within the boundaries of the easements where they bound the project. Abbreviat ions: DU I Dwelling Unit IWater Facilities1 Service DU per service DU per service_ DU per service_ Total services: l.f. - linear feet ijlj; !^Lze of service. l\o. services. .Size of service. No. services. .Size of service. No. services. imher 2 .l.f. per service. Mains ? Site ? Approach size ? Site ? Approach size ? Site ? Approach size ? Site ? Approach size Site plus approach . . Fire Hydrant.......................................................... Weight of all cast iron in proposed facilities ........ Weight of all steel in proposed facilities ............. . 'Total cost of all materials in proposed facilities . . . [Gas FacilitiesI ? Cooking ? Hot Water ? Space Heating Service DU per service Size of servicle No. services DTI per service Size of service No. services DU per service Size of service No. services Total services: Number 1 .f. per service Mains ? Site ? Approach Pressure Size ' O Si te ? Approach Pressure Size ? Site ? Approach Pressure Size ? Site ? Approach Pressure Size Site plus approach . . Weight of all cast iron in proposed facilities ........ Weight of all steel in proposed facilities ............. Total cost of all materials in proposed facilities Ifilectric Facilities ? Light ? Refrig. ? Cooking ? H.W. No. services Si ze t: f Coooe r Secondary Size l.f. Coppe r Primary Approach Size l.f. Copper Site Size l.f. Coppe r Si ze ..l.f. Steel No. grounds Sifce l.f. CoDDer Weight of copper conductors proposed facilities . Transformers Approach No. Total Capacity . . Si te No. Total Capacity . . Street Lighting Wire Size___________l.f. Coppe r Steel Street Lighting Fixtures . Constant Current Transformers No.---------Total Capacity........... Total cost of all materials in proposed facilities . . . Sewer Facilities ? Storm ? Sanitary ? Combined Approach Si te Weight of cast iron in proposed facilities . . . Total Cost of all materials in proposed facilities housing project and not in streets or QUANTITIES REQUIRED UNIT PER DU TOTAL 1. f. XXX 2 1. f. XXX 1. f. XXX 1. f. .... 07 . l.f. r XXX 1. f. XXX l.f. XXX 1. f. XXX l.f. No. XXX lb. lb. -|2C.©0 $ XXX l.f. XXX l.f. XXX 1. f. XXX l.f. l.f. XXX l.f. XXX 1. f. XXX l.f. XXX l.f. lb. lb. $ XXX lb. XXX lb. XXX lb. XXX lb. XXX lb. XXX ____i______ _ lb. XXX lb. kva kva lb. XXX lb. XXX No. XXX kva XXX $ XXX 1. f. l.f. lb. $ XXX