Skip to main content

Search the Special Collections and Archives Portal

upr000041 136

Image

File
Download upr000041-136.tif (image/tiff; 25.83 MB)

Information

Digital ID

upr000041-136
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    A / School "building. Las Vegas, Nevada, April 22, 1910* Mr. H. I. Bettisj Vice Pres. & Auditor, Las Vegas Land & Water Go. , Los Angelos, Gal. Lear Sir,- Contract for the building of our public school was let V \ last night, and I understand that the work is tc begin at once and be finished "by -September 1st, with a penalty of $10 ? 00 par day if aot fi nlsbed by t rat date« l'ho ahoooi board have asked me in reference to the piping of our-water system on to their property. Our water main, as it now lies, comes down the alloy of block 36, and up Bridgef street to'connection With the water main which comes down the alley of blocks 23 and 29, Should we all cm them to make tap on main in alley in the rear of lots 16 and 17 of block 36, or would it be advisable to carry this 3* main entirely through what should be the company owning 39 and the school ! jlock 38? let no hear from you | is soon as ccnve lent in matter. truly. Tours'