Skip to main content

Search the Special Collections and Archives Portal

upr000036 255

Image

File
Download upr000036-255.tif (image/tiff; 27.12 MB)

Information

Digital ID

upr000036-255
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    CAPITAL INVESTMENT IK WATER SUPPLY SYSTEM INTAKE PUMPING STATION Structures, including Cantilever Structure, Pump House and Buss House Equipment power Line from Sub-station near Booster pump Station Grading and Excavation Roadway-Park Service Highway to Inlet Works Causeway Mainland to Island Fencing Protective Works for Pump Columns | 366,122.52 239,728.00 118,090.51 73,257.95 251,422.92 235,965.18 9,439.26 245.91 fetal | 1,294,322.25 BOOST® PUMPING STATION Structures Equipment Grading and Excavation Reservoir Total $ 112,316.53 331,484.44 13,461.88 77,858.25 | 535,120.90 PRESSURE PIPE LINE Complete from Intake to Terminal Reservoirs A Terminal Reservoirs to Magnesium plant TERMINAL RESERVOIRS Total % 2,221,131.85 —— W i •ye>, oo o $ 428,551.37 WAT® TREATMENT PLANT Structures Equipment Caustic & Brine Pipe Lines from Chlorine Plant Construction Items Added After Completion of Contract # 364,748.92 288,569.08 22,713.45 11,954.99 Total $ 687,986.44 Total Capital Investment 7