Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.I tern (1) Un i t (2) No. Year Average of Con- Age Units structed (Yrs) (3) (H) (5) Wooden Weir Box !.J. 50 HP Submersible Turbine pump with ISO1 of Std 6* Col. complete with pump panel incl. all wiring and SO* of lead cable to connect with power line, ko1 of which is underground. Pipe & Fittings at Well: 12* Screw cross 12* x 10* Swedge nipple 10" date waive, Scr. 10* " " , FI. S* * " , FI. l/** Cock* 1" • * 10" x S W.I. Tee S* W.I.P* S* Flanges Extra 10* * * Bolts & Caskets Total for Well #6 Well #7 Total depth *M55* including: 275* - 13-3/«* - *S# Casing J91 - 10-3/** - %.5# * Ea 19*2 Ea. 1 19*2 Ea* 1 19*1 N 2 19*1 • 1 19*1 m 1 19*1 • 2 19*1 • 1 19*1 # 1 19*1 ? M 1 19*1 LF IS 19*1 Ea 5 19*1 Ea 2 19*1 Liner. Cement « 218 Sax Ea* 1 19*2 Frame Derrick Concrete Mat: Ea* 1 19*2 ExoaT. Of 2 19*2 Concrete, PI. • 12.9 19*2 Wood Weir Box Ea* 1 19*2 Weir Pend Cj 50 19*2 Weir Ea. 1 19*2 ESTIMATED COST COST OF REPRODUCTION Est. Unit New New L i f e Cond. P r i ce W i thou t % Including Less (Yrs) % $ Overhead OH Overhead Deprec i at i on (6) (7) (8) (9) (10) (11) (18)