Information
Digital ID
upr000036-170
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.OPERATING COST DATA Us August, 1944, the cost of ties trios! energy for pumping was apprise!- stately $7.29 per million gallons. Average total cost of water at pop|S of use for the first seven months 1.683 per million gallons was as follows: Dost of Water Purchased $ Supply and transmission 10.200 Storage and treatment 17.045 Distribution 3.129 Sub-total $ 32.062 Evaporation & Operating Waste 0*4-3^ total $ 32.496 i 8 8 8 NOTE: Depreciation and replacement not included. 3