Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.:P \ kos Angeles, November 19th, 1 9 I16 Close-out report for L.V.L. & W. Work Order 6oi - construct 6 8 sanitary sewer In Main Street, south of Bonanza Road, has Vegas, Is as follows: Constructed by Contract, 970*9 Lin. Ft. of & n sanitary sewer including k manholes in North Main Street and Washington Avenue extended, Las Vegas, Nevada, per A.C. Drw«< A-73*, dated June 3, 1 9 *t-S. Total charges to above W.O* are as follows: Voucher 7915 ~ Nevada Construction Co* Construction of sanitary sewer in North Main Street - Job completed - Contract Audit Mo* 10*M)6 | b,79g*oo Plus cost of bond %7.$& Voucher 60X0 Saett & Chandler Liability insurance 6 0 . 7 9 Qontraotural insurance 1*5.22 Total $ **-#919*99 One copy of A.C. Print is attached hereto. bcc Mr. A.M. Folger: R« L* Adamson,I . n Your file is returned herewith. RLA I