Skip to main content

Search the Special Collections and Archives Portal

upr000027 5

Image

File
Download upr000027-005.tif (image/tiff; 23.12 MB)

Information

Digital ID

upr000027-005
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las Vegas Nevada Evening Review-Journal April 36, 1945 Kmimw Steel Unit Ready | To Operate, Said The first unit of the Steel Con- i I; version corporation has gone !: into operation, according to G. E. Duemling, president of the firm, and will supply tools to the Guy : F. Atkinson firm, contractors on Boulder Dam. The unit is located in the ware- j house on the Westside and the j machinery was installed by the F. H. McGraw company. The second unit of the opera­tion is expected to start imme-1 diately and will be completed as j rapidly as possible, Duemling said. 1