Skip to main content

Search the Special Collections and Archives Portal

upr000018 160

Image

File
Download upr000018-160.tif (image/tiff; 26.16 MB)

Information

Digital ID

upr000018-160
    Details

    Member of

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    sax |I| . La s V e g a s La n d a n d W ater c o m p a n y C.^wHITTEMO'ftE, Prest., Los Angeles, Cal. I. BETTIS, ^icehPrest. and Auditor, Los Angeles, Cal. H. COMSTOCK, Secretary, Los Angeles, Cal. H. LEETE, Treas., Los Angeles, Cal. OFFICES PACIFIC ELECTRIC BUILDING LOS ANGELES, CAL. AND LAS VEGAS, NEV. F. A. WATERS, AGT., LOS ANGELES, CAL. W. R. BRACKEN, AGT., LAS VEGAS, NEV. laying sidewalks front company houses. e-Prest, °* \ 1.911 1 los Angeles, Gal., March 29, 1911. Mr.J.Ross Clark, Second Vice President, Building. Dear Sir: Relative to laying sidewalks in front of company houses at las Vegas: I have received your letter of March twenty-fifth and Mr.BancroftTs letter of March twenty-seventh, and, while you are apparently not both of the same mind on this, I think it would be well to get an estimate from the Chief Engineer as to what it would cost to lay the sidewalks at the present time and how much he thinks he can save over what it would cost at some future period after the houses are finished. Wont you please, therefore, get an estimate from the Chief Engineer? Yours truly, Vice President & Auditor.