Information
Digital ID
upr000017-101
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.* lltimate of cost of grading 80 lots, extending 3" water main in all#|F* Block 26, and patting in service pipesfrom mains to , 40 cottages in Blocks 25, 24 and 26, las fegas, Bevada. Freight Material Labor total Sra&ing SQ lots, SOO cu.yds. © SQe' #400.00 #400.00 frenohing and backfilling* for water main and service pipes, 284. eu.y&s .© BQtf 142.00 142.00 480* galv. W*1 ‘ water pipe 46.08 144*00 4.80 194.88 ST ItipS galv.. Crosses#' SMxSrt3E|n, for :8cr7io4 :pipc# 1*02 14.00 . •80 15.82 4400T . §n galv* ? service. pipe. 62*79 180.40 22.00 265.19 40 caps .15 1.60 1.55 40 ? §*r brass cocks •42 13.20 13.62 14620 ft. B.M. rou^a lumber 174.24 276.88 217.80 667.92 Beady Rock Hoofing, 40 squares 45*20 94.00 40.00 : 177.20 Hardware 4*48, 29.00 53.48 total #552.56 #761.88 #827.40 #1911.64 10$ Supervision and contingencies, fetal amount of estimate 75.13 32.74 157.92 #552.56 #827.06 #910.14 #2069.56 ios Jngelos, Cal., August 3, 1009.