Skip to main content

Search the Special Collections and Archives Portal

upr000001 149

Image

File
Download upr000001-149.tif (image/tiff; 100.26 MB)

Information

Digital ID

upr000001-149
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Form 30 j C. S. 3-18-30,000—™U \ WORK ORDER AUTHORITY FOR EXTENSIONS AND ADDITIONS TO EXISTING PROPERTY Aagolcs | Salt Lafc* Railroad Company. Los isgclcs -Division $hird District* at_ Yal. Sec. - levada - 10* Authority is requested for the expenditure of $___93B.fi*®® Ml Iega*» levada.___ _ (Station or Location') for (Description of Work) drilling mill far rater to estimated required depth of 800 feet. September 7,___191-20. ' New York Office—i_ No._ President’s.- -No. jf AN Genera! Manager’s-—No. Gene ra! Su pt.’s_____N o I Supt. of M. P. & M.’s__No.. Chief Engineer’s.,-- A No.... . _ . ? , _Dlw*~Eagr*—&-19S4* as shown by detailed estimate (Forms 30-1 miraifegxftkwsjibiiiiflfl attached hereto Reasons why the Expenditure is recommended: _ Additional rater supply is required at has Tegas for emergency use. well is to be located within the shop yard and an artesian flow is expected to be obtained at a depth of seven to eight hundred feet. Additional authority for expenditure will be required for piping, eto., ones water is obtained, and this will be requested later when well is in and its capacity is ascertained. the additional amount is not expected to exceed #900.00. J, JMJkJS UlrftMM; ' I VETO I It W 0 lot Included in 1920 Bttfget. Class Ho. ZQ, 1 . Total estimated expenditures - r'A.;MU| M *7810.00 2. Less—(<?) Estimated amount chargeable to Operating Expenses - - - - $ 3. (6) Estimated value of Salvage chargeable to “Material on Hand—Store Dept.*’ - $ MJ. nn 4& i i i M 3 MStOO 5. Total estimated amount chargeable to “investment in Road and Equipment’’ - - ; ~v 6. Appropriated for expenditure during calendar year r - - - - - - - - Labor $ ggO.OO Total estimated Expenditure (Item 1) <• Materia! $ 709D«Q0 Total * 7310.00 Less—Donations, Grants or Proportion payable by S NET ESTIMATED COST OF WORK TO RAILROAD COMPANY $ Correct- Division Engineerr Recommended by_^J (Signed) W. H. COMSTOCK Superiat&adent. Recommended by. Approved- ___ "General Manager Calculations and Distribution correct ORmWAL SIGNED aG. JOHNSON SEP 2 I J920 Date- President M 191__ 191- Fcr Audlt&r