Information
Digital ID
upr000001-093
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Copy to I .as Clark. t® tl Jan. 10, 1917. File 6952-HBW Mr* Arthur Maguire, Pacific Electric Building, Lm Angeles, Calif. Lear Sir? Is refer to the writer* s conversation with you mm time ago lm Los Angeles in which he agreed to giro yon an estimating figure on the cost of an 18 inoh line for Las Vegas, 1st* we build, as you ?<now, two closes of pipe, one continuous stave with individual steel bands and the other machine banded built ready to lay, and shipped in sections. In order to give you the comparison of prices we are quoting you below on both classes of pipe, erected in place « She prices arc as follows: ~ 18 inch Machine Sanded1Pipe Head Weight per ft. Cost per : 25 19.0# #1.039 50 21.0 1.108 75 22.5 1.244 18 inch Continuous Stave Pipe 7/16 in* Bands Head 50 60 70 Weight per ft. 23*4 # 23.5 24.0 Cost per ft. #1.232 1.243 1.291 The prices quoted above on 18 inch, Inside diameter, machine banded Borneo pipe are for the pipe erected in place and turned over to you free from any m