Skip to main content

Search the Special Collections and Archives Portal

man000172 71

Image

File
Download man000172-071.tif (image/tiff; 26.72 MB)

Information

Digital ID

man000172-071
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    5 WATER PRODUCTION FACILITIES #AblE D los a n 'geles""& s a l t , l a w rai lroa d-c o m p a n y Fixed Capital Original Cost and Present-Day Cost SUMMARY TOTAL Estimated y Original Cost 12/31/48 12/31/49 12/31/50 Land 2/ $ 75,900 $ 75,900 $ 75,900 Improvements 738,165 779,254 789,300 Present-Day Cost 814,065 855,154 865,200 Land 75,900 75,900 75,900 Improvements 1,061,800 1,120,900 1,130,900 $1,137,700 $1,196,800 $L, 206,800 December 31, 1949 Original Present Item Cost Day Cost Transite pipe, all sizes $ 79,886 $ 123,844 Welded steel pipe, 24” 5,743 8,471 Reinf. concr. pipe, 12? 1,084 2,742 W. I. pipe 2? 250 335 8 ", 1 0 ” & 1 2 ” 1,535 2,246 Cast iron pipe 4” 3,192 4,502 6 ” 598 863 8 ” 1,728 2,603 1 0 ” 5,633 8,328 1 2 ” 18,078 24,359 14” 15 22 16” 35,507 58,725 24? 226,389 322,036 36? 3,332 5,204 Vitrified clay pipe 6 ? 426 572 Wells, drilled 2 - 12? 13,406 19,680 9 - 16? 99,512 129,198 Derrick & weir boxes 6,076 10,912 Reservoirs 1 - 2,500,000 gal. 47,534) 205,748 1 - 1 ,200,000 gal. 97,572) Settling basins 21,674 33,335 Buildings - concrete 15,204 18,742 frame 4,440 8,297 Manholes & valve boxes 5,078 9,320 Fencing 6,089 8,994 Tank, wood on concr. found. 511 894 Pumping equipment 46,393 57,840 Miscellaneous 1,801 2.43 V «/' Power Line - Poles 4,615 6,544 - J P Wire 25,953 55,107 ^ Total $7797251 $1,120,900 /(y Land 75,900 75,900<y Total, incl. Land 1/ With land at present-day cost. $855,151 $1,196,800 2/ Includes 679.42 acres of production land and and pole line rights of way. also pipe line