Information
Digital ID
man000172-068
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.3 TABLE B WATER PRODUCTION FACILITIES Los Angeles & Salt Lake Railroad Company Fixed Capital Investment Cost SUMMARY TOTAL Estimated 12/31/48 12/31/49 12/31/50 Land $ 34,986 $ 34,986 $ 34,986 Improvements 738,165 765,397 775,400 Total $'773,151 $800,385 $810,586 Investment Cost - Per Books Item As of 12/31/49 Land (1230.74 acres) Pipe - $ 34,985.88 Transite, all sizes 78,562.71 Reinforced concrete, 12” 1,083.96 Vitrified clay, 6 ” 426.34 Welded steel, 24" 4,622.07 Wrought iron, 2" 250.00 8 ”, 1 0 " and 1 2 " 1,535.01 Cast iron, 4" . , m u /jA 3,192.11 597.71 8 " and 1 0 " 7,361.20 12" and 14" 18,093.54 16" 24,094.00 241* 226,389.25 36" 3,331.98 Wells - 2 - 12", drilled 13,406.30 9 - 16" " 99,511.26 Derricks and weir boxes 6,076.18 Reservoirs, 1 - 1,200,000 gal. 97,571.47 1 - 2,500,000 gal. 47,534.25 Settling basins, concrete 21,673.71 Buildings - concrete 15,204.33 frame 4,439.81 Manholes & valve boxes, concrete 5,078.05 Fencing 6,089.04 Tank, wood on concrete foundation 510.65 Primping equipment 46,393.37 Miscellaneous Power Lines - Poles I,800.78 * 4,614.74 Wire & equipment 25,952.79 Total $800,382.49