Skip to main content

Search the Special Collections and Archives Portal

man000172 14

Image

File
Download man000172-014.tif (image/tiff; 26.47 MB)

Information

Digital ID

man000172-014
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    7 3. Plant Facilities Production Company: Companion growth, of the railroad-owned production facilities has been such that starting with the original three springs, used entirely for railroad purposes, there has been developed an integrated production, storage and transmission system whose major component parts (listed in reference to the period of initial operation) are; Prior to 1940 3 - Springs 2 - Drilled artesian wells, 12n (free-flowing year around) 1 - Concrete settling basin, capacity 8 MGD 1 - Concrete reservoir, 2,500,000 gal, capacity 26,773 ft. - Transmission mains, principally C. I,, transits, steel and reinforced concrete, ranging in size from 8 to 36 inches. 1940 to 1949, inclusive 9 - Drilled artesian wells, 16n (3 fitted with pumps) 2 - Concrete settling basins, combined capacity 8 MGD 1 - Concrete reservoir, 1,200,000 gal. capacity 2 - Booster pump stations 25,120 ft. - Transmission mains, principally C. I., transite and steel, ranging in size from 8 to 36 inches Prom the above list it will be noted that the expansion in water production facilities in the last 10 years greatly exceeds that of the entire first 35 years of the water works’ existence. Water Utility; The original distribution system of wood-stave pipe has been completely replaced. There are today more than 60 miles of mains (over 98$ cast iron) in the system, which has been constructed to conform to recognized standards of water works practice. A summary of distribution mains in use on December 31, 1949 follows on page 8 . During the first nine months of 1950 substantial additions to distribution mains were made and the present rate of