Skip to main content

Search the Special Collections and Archives Portal

man000165 41

Image

File
Download man000165-041.tif (image/tiff; 37.2 MB)

Information

Digital ID

man000165-041
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 gigl sum of THREE THOUSAND ONE HUNDRED THIRTY-FIVE DOLLARS ($3,135.00) specified in Paragraph 1 of Article I hereof, and the furnishing of such necessary easements, and the furnishing of the policies of title insurance aforesaid, to order the necessary pipe, fittings and other material and upon the arrival of pipe and material afore­said at Las Vegas, to proceed with the installation of said water main along the lines so staked upon the ground by the Subdivider, and to complete the said installation with reasonable diligence* Said water main shall consist of 6” cast iron pipe. Construction of said water main shall not be commenced until the provisions of this subdivision 1 have been complied with. 2. To pay to the Subdivider at quarterly intervals, thirty-five percent (35$) of the revenue received by it from consumers located on Lots 7 through 42 inclusive in Block 1 of Boulder Dam Homesite Addition and taking direct service from water main con­structed hereunder for a period of ten (10) years from date of 3 ~ / 0 ~ S*/ completion^of said installation or until Subdivider has been re­paid the actual cost advanced by him, whichever first occurs. ARTICLE III. It is mutually agreed: 1. That the water main so installed shall be and remain the property of the Company. 2. Should the actual cost of the installation of said water main exceed the estimated cost of $3,135.00, then and in that event, the Subdivider will pay the excess to the Company, upon demand; if said actual cost be less than $3,135.00, then the - 3-