Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.2 , Should the actual cost of the Installation of said water mains exceed the estimated cost of #2,470.00, then and in that event the Subdivider will pay the excess to the Company, upon demand; if said actual cost be less than $2,470.00, then the Company will pay to the Subdivider the difference between said estimated cost so advanced and the actual cost. By actual cost is meant the cost of all material and supplies delivered to the job, the cost of all labor employed in connection with the installation of said water main, the cost of premium on contractor’s surety bond, Public Liability, Property Damage and Contractor’s Contractual Liability Insurance, plus ten percent (10%) for supervision and overhead. yh: 3. This agreement shall inure to the benefit of and be finding typon the heirsi, executors, administrators, successors and assigns of tlie respective parties hereto. Attest: "Secretary LAS VIE GAS LAND AND WATER COMPANY Vice President ! S p w M Witness-:— (/SEAL) " WM. s 4'//3 I P