Skip to main content

Search the Special Collections and Archives Portal

man000162 113

Image

File
Download man000162-113.tif (image/tiff; 36.48 MB)

Information

Digital ID

man000162-113
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    is agreed to be the sum of Thirty-nine Thousand Two Hundred Fifty-six Dollars and Eighty-four Cents ($39,256.34). The location of said water mains is indicated by yellow lines on said Exhibit A. WHEREAS, the Subdivider has agreed to construct 3,300 linear feet of additional water main to serve Bonanza Village Tract in location indicated by red lines on map attached hereto marked "Exhibit B" and hereby made a part hereof; and WHEREAS, the Company is willing to install at its e x ­pense, a connection to the water main to be constructed b y the Subdivider under this agreement and will allow Subdivider certain refunds of cost for portion of w a t e r main constructed by Subdivider in accordance with Rule 9-A on file with the Public Service Com­mission of the State of Nevada, approved January 16, 1940: AGREEMENT NOW, THEREFORE, THIS AGREEMENT WITNESSETH: ARTICLE I Subdivider agrees: 1. At its own expense to furnish all necessary materials tools, equipment and labor and to construct 3,300 linear feet of 10-inch and 12-inch water mains between E n g i n e e r ’s Station 24 plus 32 and E n g i n e e r ’s Station 62 plus 32, in location as indicated by red lines on said Exhibit B. The cost of constructing said water mains is estimated to be Twenty-two Thousand Four Hundred Ten Dollars ($22,410.00). 2. Said w ater main provided for in Paragraph 1 of this Article I shall be constructed under the personal supervision of 2. A 3 8