Skip to main content

Search the Special Collections and Archives Portal

man000161 45

Image

File
Download man000161-045.tif (image/tiff; 36.62 MB)

Information

Digital ID

man000161-045
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    of the center line of that portion of the pipe line constructed by the Sub-divider in other than dedicated streets and alleys. 1 . Upon the execution of this agreement, the payment of the sum of ONE THOUSAND SEVEN HUNDRED FIFTY DOLLARS,($1,750.00), specified in paragraph 1 of Article 1 hereof, and the delivery of the easement specified in Paragraph 4 of Article 1 hereof, to order the jiecessary pipe, fittings and other materials and upon the arrival of pipe and materials aforesaid at Las Vegas, to proceed vith the installation of 350 feet of 10 inch cast iron water line in location indicated by yellow line on the attached Exhibit "A", and to complete the said installation with reasonable diligence. The Company shall bear all cost in excess of the agreed value of $1 ,750.00 for an 8 inch cast iron pipe in said location. 2. To pay to the Subdivider at monthly intervals, fifty percent (50$) of the monthly revenue received by it from customers talcing sertice from the water mains so installed hereunder, for a period of ten (10) years from the date of the completion of said installation, or, until the Suo^. (a) $1,750.00, being the agreed value of 350 feet of 8 inch water main, and (b) the actual cost of constructing 1,835 feet of 8 ifcch and 3k0 feet of 6 inch cast iron water main; but in no event shal1 the Company refund in excess of the total sum of $12,080.00, whichever occurs first. ARTICLE II The Company agrees: have been refunded an amount equal to the sum of: - 3 -