Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
(1) PERMIT FEE for any construction which requires a permit $1.00 (2) CONCRETE WORK: Permit Fee (in addition to inspection charge) 1.00 Inspection Charges: Curb, and Curb and Gutter 1 to 100 feet .10 per foot 100 to 1000 feet 10.00 plus $0.05 per foot Sidewalks: 1 to 200 sq. ft. .02 per sq. ft. minimum charge of $1.00 201 to 1000 sq. ft. 4.00 plus $0.01 per sq. ft. for each foot over 200 All over 1000 sq. ft. 12.00 plus $0.005 per sq. ft. for each foot over 1000 Driveway Approach: Single - curb cut of 14 ft. or less 3.00 each Double - curb cut of 14. to 20 ft. 5.50 each Triple - curb cut of 20 to 32 ft. 7.50 each Over 32 ft. (where allowed) 7.50 plus $0.15 for each foot over 32 ft. (3) STREET CONSTRUCTION: Excluding curb, gutter, etc. .005 per sq. yd.-$3.00 minimum (4) LATERAL AND MIN SEWERS: Engineering Extension of existing mains Sewer, Plans & Specifications +25.00 per day per man for office engineering Sewer, Line and Grade ++60.00 per day for field survey party (5) LATERAL AND MAIN SEWERS, excluding House Connections: Inspection 8" line $ .02 per ft. 10" line .02 per ft. 12" line .025 per ft. l4" line .025 per ft. 16" line and over .025 per ft. (6) STREET LIGHTS: Bases (excavation and concrete) Minimum $2.00 or $0.50 per base Electrical Minimum $2.00 or $0.25 per pole + Saturday, Sunday and Holidays - Rate is $50.00 per day. ++ Saturday, Sunday and Holidays - Rate is $100.00 per day. (7) STREET OBSTRUCTIONS: (Except barricades in connection with building construction) Permit Fee $2.00 Deposit required 50.00 for every 50 ft. of street or sidewalk length, or fraction thereof Inspection Charge 6.00 for each 30 days or fraction thereof; not to exceed the amount deposited and to be deducted from same. (8) MISCELLANEOUS: (Advance payment required) Easement, Abandonment 25.00 charge; no refund Street, Abandonment 100.00 deposit to cover actual cost; balance refunded. Paths - Walks - Steps, Abandonment 25.00 charge; no refund General: A. Special plans and specifications; +25.00 per day per man for office engineering grading or regrading streets; concrete sidewalks, curbs, and ++60.00 per day for field survey party curb and gutter; pavements in roadway; culverts and drainage; sewers; structures of masonry, brick, or concrete; maps of assessment districts. B. Moving & replacing monuments At actual cost with minimum charge of $30.00. Deposit to be made to cover estimated cost. C. Final certificate of work performed 10.00 charge (9) ALL OTHER +25.00 per day per man for office or field engineering. ++60.00 per day for field survey party. + Saturday, Sunday and Holidays - Rate is $50.00 per day ++ Saturday, Sunday and Holidays - Rate is $100.00 per day