Skip to main content

Search the Special Collections and Archives Portal

Las Vegas City Commission Minutes, May 26, 1952 to February 17, 1954, lvc000008-554

Image

File
Download lvc000008-554.tif (image/tiff; 58.13 MB)

Information

Digital ID

lvc000008-554
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    524 ADDITION TO CENTRAL FIRE STATION Call for Construction Bids 25TH STREET PAVING Deferred construction bids for this addition and revision of the City Hall fo be opened December 2, 1953 at 7.30 P.M. be approved. Motion seconded by Commissioner Jarrett and carried by the following vote: Commissioners Bunker, Jarrett, Sharp, Whipple and His Honor voting aye; noes, none. The plans and specification for the addition to the Central Fire Station were presented at this time. Commissioner Whipple moved that bids for the construction of this addition to the Central Fire Stations be issued, said bids to be opened at a regular meeting to be held December 2, 1953 at 7:30 P.M. Motion seconded by Commissioner Sharp and carried by the following vote: Commissioners Bunker, Sharp, Whipple and His Honor voting aye; noes, Commissioner Jarrett. Discussion was held on the proposed paying of 25th Street between Ogden and Stewart Avenues. City Engineer George Wade submitted a tentative cost of the project of the work being done by the City and the figure of the estimated cost of the project if done by a licensed Contractor. The Board indicated that this matter should be held over until next year. EXCAVATION ON 25TH STREET The City Engineer recommended that the request of Ideal Asphalt Paving Company for payment for the excavation on 25th Street, said project being in the total amount of $1,819.80, be approved less the 10% retention to cover possible liens. Commissioner Jarrett moved the recommendation of the City Engineer to accept the excavation oh 25th Street as performed by the Ideal Asphalt Paving Company be approved. Motion seconded by Commissioner Sharp and carried by the following vote: Commissioner Bunker, Jarrett, Sharp, Whipple and His Honor voting aye; noes, none. Thereafter Commissioner Whipple moved the recommendation of the City Engineer be accepted and the request for payment to the Ideal Asphalt Paving Company in the total amount of $1,637.82 be approved and the Mayor and Clerk authorized to sign the warrant when prepared. Motion seconded by Commissioner Sharp and carried by the following vote: Commissioners Bunker, Jarrett, Sharp, Whipple and His Honor voting aye; noes, none. OPENING OF BIDS FOR SEWER This being the time heretofore set for the opening of bids for the installation IMPROVEMENT PROJECT of sewers as called for in schedules B and C of the Sewer Improvement Program, Schedules B & C bids were received and opened from the following firsm: SCHEDULE B SCHEDULE C SCHEDULE B & C MIKE RAMLJAK 3001 Worthen Los Angeles, California $1,11+5,390.88 N. P. VAN VALKENBURGH 8609 San Vincent South Gate, California $380,381.80 $259,278.10 639,699.90 J. H. WELSH & SON 805 S. Central Phoenix, Arizona 489,560.39 290,1+99.30 764,458.49 WELLS CARGO & GEO. E. MILLER 2000Fremont Las Vegas, Nevada 616,1+16.85 CANNON CONSTRUCTION P. 0. Box 1+31 Stockton, California 329,686.49 225,980.84 544,553.99 CHARLES J. DORFMAN 124 N. LaBrea Los Angeles, California 421,138.70 261,630.30 667,748.09 RALPH 0. DIXSON 301,767.91 216,977.62 518,71+5.53 San Carlos, California WESTERN LAND & DEVELOPMENT CO Bid not accepted, not qualified to bid. McCAMMON-WUNDERLICH CO. P.0. Box 359 Palo Alto, California 593,081.90 MORRIS KNUDSON 411 W. 5th Los Angeles, California 357,129.35 244,819.25 599,500.41 TAYLOR & SLOAN P. 0. Box 357 La Mesa, California 436,999.00 279,144.50 680,336.02 LONGLEY CONSTRUCTION CO. 421 W. Bonanza Road 549,093.30 31+1,853.25 819,669.91 Las Vegas, Nevada