Information
Date
1978-06-23
Description
Pg.76 #3269 Boulder Dam, looking downstream from the Arizona side. May 27, 1935. Pg.76 #3284 Looking in a general downstream direction, on the Arizona Black Canyon Highway, showing Six Companies Inc. road work. May 27, 1935. Pg.76 #3296 Boulder Dam, looking downstream from the Nevada side, showing Spillways and the Intake Towers. June 1, 1935. Pg.76 #3303 View of the open cut portion of the Switchyard Control Circuit Tunnel. Shovel is excavating for the Switchyard, and the building in the foreground is the power sub-station. The Babcock and Wilcox Company plant can be seen in the extreme background. June 1, 1935.
Digital ID
pho027842-132
Physical Identifier
album #1, page 76