1972-05-18
Description
Pg.57 #2963 No.5 Intake Tower finished to Elevation 1232, showing curtain wall. Dec. 5th, 1934. Pg.57 #3009 Telephoto looking downstream into the Arizona Spillway, showing construction of the spillway bridge. Jan. 8th, 1935. Pg.57 #2980 Looking upstream at the upper end of No.1 plug, showing forms for the Intake Transition. Dec. 19th, 1934. Pg.57 #2977 Looking upstream into No.1 plug, showing the placing of the high pressure valves and method of pouring. Dec. 19th, 1934.