Skip to main content

Search the Special Collections and Archives Portal

Warren A. Bechtel Album of Hoover Dam: photographic print

Image

File
Download pho027842-029.TIF (image/tiff; 171.87 MB)

Information

Date

1971-07-01

Description

p.5 #948 Foundations for the trash rack structure being installed in front of upper portal of Diversion Tunnel no.2. This is where the first pay concrete was poured. Mar. 7, 1932. p.5 #943 View of gravel plant, showing live storage of screened aggregate and sand in foreground. Storage pile for raw aggregate in background. Mar. 2, 1932. p.5 #951 Upper portals of Diversion Tunnels No.1 and 2. Note workmen scaling above portal of Diversion tunnel No.1. Mar. 7, 1932. p.5 #937 Night view of gravel plant, taken near first scalping screen, and looking in opposite direction than the view on left. Feb. 26, 1932.

Digital ID

pho027842-029

Physical Identifier

Album #2, page 5
    Details

    Publisher

    University of Nevada, Las Vegas. Libraries