Image
Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Publisher
Transcription
BOB KIERNAN DESIGN TECHNICAL MANA&EMBstT NEW YORK OPERATIONS 2140 ROUTE S3 Sure 157 BRICK, NEW JERSEY 03724- Telephone (NYC): 212-^-7^-851^ Facsimile: SOS-703-3830 email : bkshowmar@ooi.com Date: March 31, 1995 Project: SandCastle Production Show 1995 SandCastle Entertainment Complex / Guam Contact: Bob Kiernan Kiernan Design / Technical Management April 6th to1 Oth Hotel Sofitel 8555 Beverly Boulevard Los Angeles, CA 90048 Phone: 310-278-5444 Fax: 310-657-2816 April 11th & 12th 212-479-8519 April 13th to 15th Hotel Sofitel (as above) Client / Producer: SandCastle, Inc. Mr. Rizk Saad, General Manager 1199 Pale San Vitores Road Tumon, Guam 96911 1.1 Drawings and Work Sheets ?╟÷ the set of available scenic drawings with the supporting work sheets are attached. Plan and section drawings: #1, #17 and #26A are also provided for reference. Drawing: #15 is not provided. 1.2 Artwork, Paint Elevations, Specifications ?╟÷ all drawings provided will be supported further by complete artwork, samples, models (where applicable) and mechanical specifications from the designer, who will be in Los Angeles during the week of April 10th. Contact Bob Kiernan with any questions at this time. 1.3 Schedule ?╟÷ the drawings and work sheets are arriving to you on or about Wednesday, April 5, 1995. It will be helpful to discuss the project specifications and answer any questions from April 6th to 8th. We request an estimated preliminary quotation on Monday, April 10th if possible. Final pricing and contract will be discussed during the third week of April so that work can begin on May 1, 1995. The scenery should load out of the shop on or about June 28th for ocean freight to Guam. Installation begins August 1, 1995. PRODUCTION / LAS VEC3AS : ASIA / PACIFIC / OUAM : 3230 EAST ==i*AMIN(50 ROAD Sure "-S5 ^AS VEOAS. NEVADA 8^121 1270 NORTH r-AR'NE DRIVE No.: ^C - 2^6 TAMUNINO, OUAM g><S3M