Information
Digital ID
snv002115-009
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.SUGGESTIONS AND CONCLUSIONS - Continued.to the boundary line with the Black Butte Company.Further work of exploration at depth can be taken up at a later date but the work done from the 200 foot level shouldbe carried on with due regard to future and more extensive exploration and mining of the ground and economical equipment should he installed in the shape of air compressor and drills in order that the expense may be kept to the lowest possible point.It is estimated that this preliminary work can be done at a cost for equipment, labor, supplies and superintendence of approximately ten thousand dollars ($10,000.00) and it is not without reason that we predict that with this expenditure we can place the property on a basis where its production will pay for further developement and dividends.GOLDFIELD BELMONT EXTENSION MINING CO. BY - FRANK M. CHAMBERS, JANUARY 28,1915. PRESIDENT & MGR.~s-