Archival objects in this container: Initial Report on Stress Corrosion-Cracking Experiments Using Zircaloy-4 Spent Fuel Cladding C-Rings - Prepared for the U.S. Department of Energy Office of Civilian Radioacive Waste Management, undated Design, Development and Testing of a Solar-Powered Multi-Family Residential Size Prototype Trubocompressor Heat Pump - Solar Energy, 1982 October Continuation of Lithologic Log of Hole UE4A, Nevada Test Site - United States Department of the Interior, Geological Survey, 1961 November 27 Control Systems Calculations Volume 1 for 90% Review - Yucca Mountain Site Characterization Project, Exploratory Studies Facility, Package 2B, YMP 94-2B/Control Calcx V.1, 1994 January 05 Core-Logs of the Vertical Borehole V2 - Stripa Project 82-05, CHR.881122.0030, 1982 August Long-Term, Low-Temperature Oxidation of PWR Spent Fuel - Interim Transition Report, Prepared for the U.S. Department of Energy Office of Civilian Radioactive Waste Management, undated Buffer Mass Test: Site Documentation - Stripa Project 83-04, CHR.881122.0037, 1983 October Core-Logs of Borehole V1 Down to 505 M (Part 1) and Measurement of Triaxial Rock Stresses in Borehole V1 (Part 2) - Stripa Project 81-05, CHR.881122.0025, 1981 July Toxicity of Power Plant Chemicals to Aquatic Life - United States Atomic Energy Commission, 1973 June Buffer Mass Test: Software for the Data Acquisition System - Stripa Project 82-03, CHR.881122.0028, 1982 August Quality Assurance Measures for Certification of Tru Waste for Shipment to the WIPP - Waste Isolation Pilot Plant, 1982 April Yucca Mountain Site Characterization Proheject, Topical Report - OCRWM, 1993 March Borehole and Shaft Sealing: Site Documentation - Stripa Project 85-01, CHR.881123.0006, 1985 February Handbook of Thermodynamic Data - Geological Survey, 1974 January Buffer Mass Test: Rock Drilling and Civil Engineering - Stripa Project 82-07, CHR.881122.0032, 1982 September Buffer Mass Test: Buffer Materials - Stripa Project 82-06, CHR.881122.0031, 1982 August Geochemical and Isotope Characterization of the Stripa Ground Waters: Progress Report - Stripa Project 83-01, CHR.881122.0034, 1983 February Core-Logs of the Subhorizontal Boreholes N1 and E1 - Stripa Project 82-04, CHR.881122.0029, 1982 August Control Systems Specification Sections for 90% Review - Yucca Mountain Site Characterization Project, Exploratory Studies Facility, Package 2B, YMP 94-2B/Control Specx, 1994 January 05 Hydrogeological and Hydrogeochemical Investigations in Boreholes: Fluid Inclusion Studies in the Stripa Granite - Stripa Project 84-07, CHR.881123.0004, 1984 October Preliminary Predecisional Draft Material - Reviewer's Handbook 90% Design Review Desgin Package 2B, YMP 94-2B/Handbookx, 1993 December 13 Buffer Mass Test: Predictions of the Behaviour of the Bentonite-Based Buffer Materials by L. Borgesson - Stripa Project 82-08, CHR.88112.0033, 1982 August Project Baseline Document: Exploratory Studies Facility Design Requirements, Volume 2 - Yucca Mountain Site Characterization Project, YMP/CM-0019 V.2, 1993 July