Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.ESTIMATE OF COSf TO EXTEND WATER MAIN TO GOVT. LOT 1. BlUffoI 2. EAST uHABLESTOii BLVf Material: 3870* - 8* C. X. Pipe # 2*20 Ft $8514.00 5900* - 6* G. I. Pipe d 1.50 Ft 8850.00 2 - 8 x 6 G. I. Teea « 17.50 Ea 35.00 6 - 6 x 6 8. I. Tees # 15.00 Ea 90.00 2 - 8 “ Gate Valves « 65.00 Ea 130.00 8 - 6 * Gate Valves « 40.00 Ea 320.00 117.939.00 Labor: 9770 Ft Trench. Lay, Joint and Backfill # 1.00 Ft 9*770.00 1Q$» Contingencies 2,771*00 10JI Overhead and Supervision 3*040.00 133.520.00 Fori Philip A. Shipley Desert Spa Las Vegas, Nevada August 18, 1948