Information
Digital ID
man000165-140
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 La- 19 20 21 22 23 24 25 26 mandj if said actual cost be less than f>638.00, then the Company will pay to the Subdivider the difference between said estimated cost so advanced and the actual cost. By actual cost is meant the cost of all material and supplies delivered to the job, the cost of all labor employed in connection with the installation of said water main, the cost of premium on contractor’s surety bond, Public Liability, Property Damage and Contractor’s Contractual Liabilityr^nsurance, plus ten percent (10%) for supervision and overh" e**a d £ * ? -lVi.S 3, This agreement shall in; urfee It"o the benefit of and be binding upon the heirs, executors, administrators, successors and assigns of the respective parties hereto. IM WITNESS WHEREOF, the, parties hereto have executed this agreement as of the day and year first above Witten’. Attest: ,$$GAS LAND AND-"WATER COJIPANy By.h i Vice President L. T. GARRETT I