Skip to main content

Search the Special Collections and Archives Portal

upr000161 160

Image

File
Download upr000161-160.tif (image/tiff; 26.87 MB)

Information

Digital ID

upr000161-160
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    but not less than 800 feet and not to exceed 1200 feet; said work to be commenced within five calendar days from date of said agreement and completed within fifty calendar days there­after; consideration; (a) For portion of well in which 16-inch casing is set; 0 feet to 800 feet, $20.70 per foot 800 feet to 1,200 feet, 19.15 per foot (b) For portion of well in which 12-inch casing is set; $19.15 per foot (c) For time spent by Contractor in developing, testing and cleaning well, $1,336.00 for first 24-hour period plus $14.00 for each additional hour. (d) For additional labor to perform work as directed by Engineer not covered by this contract for which w0rder on Contractorw will be issued, $12,00 per hour. (e) For welding circumferential seams of casing from 0 feet to 200 feet, $60.00; be, and the same is hereby, ratified, approved and confirmed. Following Authority for Expenditure Requests, approved by the President, were submitted for ratification; W. 0. No. 745-1, issued April 13, 1954; Las Vegas, Nev.; constructing 670 ft. of 8M and 655 ft. of 6M cast iron water mains and 20 ft. of 6M cast iron fire pro­tection laterals for two hydrants to serve Morning View Heights Subdivision Tract No. 1. Total estimated expenditure, $5,259, chargeable to Investment in Water System - Las Vegas, Nev. This work order supersedes and cancels W. 0. No. 745, approved July 30, 1953. AFE No. 9, (W. 0. #784), issued April 20, 1954; Las Vegas, Nev.; constructing 860 ft. of 8” cast iron water main in Oakey Blvd. to fill gap between main at 15th Street and to point west of Cochran Street including 8W pressure reducing valve. Total estimated expenditure, $6,583.00, chargeable to Investment in Water System-Las Vegas, Nevada.