Skip to main content

Search the Special Collections and Archives Portal

upr000067 185

Image

File
Download upr000067-185.tif (image/tiff; 26.75 MB)

Information

Digital ID

upr000067-185
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    ,;v SECTION 1. District agrees to remove (»} Pipe lime between points KK and LI. Comment As substitute line must be provided before this line is removed, suggest this subparagraph be eliminated from Section 1 and incorporated la Sections 2 and % (b) Pip® line between points II and $1. * 1 Reoently there ha® been some public demand that County acquire new site and construct modem home for indigent®, in which event present sit® would be available for industrial purposes. To permit orderly development the portion of the 8“ line between points II and Q, should be removed and reconstructed along the southerly prolonga­tion of i Street from Point $ to connection with line bet­ween points K and Tf. This location is preferable to the line indicated between points TT and SS as there is no line in Bonanza Road at Point SS. Likewise this subparagraph should be eliminated from Section 1 and incorporated in sections 2 and 3* (o) and (d) Power Lines. Somment In addition to removal of power lines referred to in subparagraphs (c) and (d), the power line from point FF to pump station at HR, which is to be relocated, should be removed. In addition to the above, I suggest the following: 1. An additional subparagraph be added requiring removal of the pipe line extending easterly from the pumping plant at HI to connection with the water line extending southerly along center lines of section 33 from point R through Point FF. Zm Provision that in event of failure of District to remove facilities referred to in this Section 1, that Railroad Company may remove at District ex­pense.