Skip to main content

Search the Special Collections and Archives Portal

upr000068 56

Image

File
Download upr000068-056.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000068-056
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 said mm pipe 11m into the main extending along Bonanza Road. In til# event the MfltaHta* shall fall to mmm its* wine lines to in subparagraphs (e) and (d) of title section, with- In M period a&ove mentioned* the Rail mi Companies shall have thu right to remove mM wim lines and to e one treat* m iffUfi with the B0UTHERM wmmk ?mm mmmt for the construction of, new ©on- nmtlmm between the existing power facilities of the Plstriet and the power lines If the Southern Hevais fewer Soapany so as to pro- vMe power for the epwratiagi of the water production facilities lo­cated upon the land shown tinted in pink on Exhibit .|%- $ha Railroad Companies shall have the right to construct such facilities mpm the property of the- Bisbrlst as shall he nee- •asary to- aaanaat said new pipe line ami mat poser line emmaeetifme into the existing, facilities of tie Bis trio t. %®a the camp let Ion of said weak the MatrSat shall pay to the Railroad Companies ,with~ ia thirty {$€*) days after rendition of Mil therefor, the actual cost te iMlroM ieapanles and the Southern Nevada fewer Company of removing salt pipe lines and wire lines and somtrusting said new pipe Hue and said new power line connect tons pim ten percent (Jggv of said actual cost of sometime tten. representing the east of caper- vision.* 3 3 .