Skip to main content

Search the Special Collections and Archives Portal

upr000068 33

Image

File
Download upr000068-033.tif (image/tiff; 26.88 MB)

Information

Digital ID

upr000068-033
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 ttan water as a public utility In the City of lac fW# Havana# upon the sale date. Dm said water dis­tribution stains which mm completed ant In use by the Water Company m September 1, Iff®, are- shewn by ret eolored lines m map attached hereto, Ml Exhibit WC,: AHD MAM a part hereof, the water distribution aains which were in the course of construction by the later Company on September 1, lift, are shown’ by green colored line# on said Exhibit *«*. It la understood that the said distribution facilities Include service connections net shown lay colored lines on Exhibit n®n which are now owned by the Water SJoa^any and which ex­tend between the said sains shorn by colored lima, on Inhibit "c" and the service lines owned by customers receiving service frest said distribution- system. Cg) All additions and betterments to or exten­sions of the water distribution facilities referred to in subparagraph (f) of this Section 1 constructed by the First Parties, or any of them, between Septem­ber l, i$9ft# «»d the sale date, mu addition, bet­terments and extensions will include those under e«n* struction but not completed on 3epfc«e&er 1, Iff®,shown by green lime on Exhibit *#* and those, the construc­tion of which was started after September 1, Iffy, and prior to 7?) / /&,s-. $ I shews. by yellow eel- evat lines «n Exhibit *f®, 2 3 .