Skip to main content

Search the Special Collections and Archives Portal

upr000173 44

Image

File
Download upr000173-044.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000173-044
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Lab Vegas « September 8, Xf6§ V 2 > 1 -5 1 Hr, 0. H, Cory: I oo - Mr, Mm, Reinhardt Mr. £. E. Bennett) Mill you Mindly prepare our uau&l fora of contract to ©over labor required In installing ap­proximately 5200 feet of 6-inch and 3-inch cast iron pipe to serve the new Creetwood home© Tract on East Charleston Boulevard. Description of the work to he performed is as follows: Commencing at a connection with the existing water main at Charleston Boulevard and Chapman Drive thence easterly in Charles­ton Boulevard a distance of 2550 feet, more or less, to Point *A* at the northwes t corner of Creetwood Somes Tract; 650 thence easterly feet to the westerly side of Block 8; then commencing at Point *A* above described southerly 700 feet to a point between Blocks 2 and 3j thence at right angles easterly be­tween Blocks 2 and 3 a distance of 650 feet to the west side of H o o k 7? then commencing at a connection with the water line above described at the west side of Block 1, thence easterly between H o o k e 1 and 2 a distance of 650 feet to an end. The letter of agreement should be addressed to Nevada Construction Company and the consideration le $6620.00. A. K. Folger