Information
Digital ID
upr000175-144
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Xcur letter Kay 14, file EB 9-2-4, regarfc- lag olosc ©at report of charges to VfO~6l4, water main extension to Bonanza Village tract: In explanation of the #5*22 adjustment Item, the Water Company * s portion of tile line was 901 Ft* of 12® §* 1* pipe, of which amount 865 feet was taken from our MOB and the remaining 3 6 feet was received from Tiberti, for which we gave M s credit on oar Bill Collectible Be - 16 of Kay 3rd at the same rate as our own 12* C. I* pipe or $4,165 per foot* Severer, when the cost statement was received from the sub-dividers, it was noted that their cost per foot was only $4.02, a difference of .145 per foot for the 36 feet, or $5*£2. Inasmuch as the agreed price of the 12* C. X. pipe was $4,165 per foot in the exchange for 10* pipe shown In our Bill Collectible, we credited the difference $5*22 to fiberti in the final adjustment of charges. Regarding the freight charges on the 12 X 6 tee and plug furnished for fire Igrdrants, we have corrected our bill against the city to include a portion of the freight charges, $4.33, and are attaching hereto corrected copy* Hr« I*. A* ® it 8 I