Information
Digital ID
ent000359-002
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.9) stage floor 10} stage floor SCENERY SCHEDULE (cont.) Bench prop 4 (existing) palm trees APT INDUSTRIES On-site and BK supplies mat%1, 280.00 8-17 300.00 8-17 11) stage floor Black Mylar slit-drape (1") panels (4 ea.: 18"x120") for step platform Lighting set in platform BK/Rose Brand On-site and BK supplies mat?√ß1. 108.00 8-10 215.00 8-17 12) 15/floor pc. 5 Afro/Caribe profile flats FP Felt collage BK supplies mat'l 4183.00 sub direct LAS 8-17 13) House front Valance (custom) rain truss masking (in 100% fullness) JRJ to provide fabric sample; Rose Brand sews 1250.00 8-3 14) FOH install 15} stage rig 16) Effects Water "Rain Curtain" as spec'd. Installation supervision (Pat H.) "ColorRay" lighting system Technical support - install Smoke machine(s) 2-way UV lighting package Smoke fluid initial supply Ray-lite beam lamp replacements IDEAS (contract) IDEAS {contract} 14532.00 , 7-25 1400.00 8-6 LASERMEDIA (oafe|4{) 21770. BK to sub(|j^-n>( cauf. BK/Cinema Svcs. ?╟≤P 00 500.00 1160.00 650.00 310.80 382.50 7-25 8-6 8-17 8-17 8-17 8-17