Information
Digital ID
upr000211-027
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles, March 6th, 1942 Mr. H. H. Larson: Referring to my conversation with Division Engineer relative to raising wall of present settling basin at Las Vegas two feet: Attached please find three prints of Dwg. No. 16050, dated Maroh 5, 1942, showing details of this work. Quantities of material involved in raising the wall are as follows: 12 Cubic Yards Concrete, 1-2|--3| mix. 1100 Lineal Feet 1/2" round corrugated reinforcing bars (vertical bars to be out to length on Job) 50 5/8" round by 12" bolts with nuts. 3 Gallons "Hydro-Seal". In accordance with understanding with Mr. Mack, he will issue requisition for the above material; also for all materials required for replacing the roof system after same has been removed. I understand transit mix concrete can be obtained in Las Vegas; therefore it will not be necessary to order aggregates for the above 12 cublo yards of oonorete. This work should be done as quickly as possible. R. L. Adamson S H ??4