Skip to main content

Search the Special Collections and Archives Portal

upr000105 268

Image

File
Download upr000105-268.tif (image/tiff; 26.31 MB)

Information

Digital ID

upr000105-268
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

(e) The Railroad Co. would still he In the water business to a limited extent. (d) It la very doubtful whether the capital expenditures and future maintenance costs would be economically Justified. Recommendations t (1) Arrange with State Engineer for transfer of exist* lng S.5 Sec. Ft* appropriation alloted for R.R.Ce. purposes at Well #1, or a portion thereof, from Well #1 to R.R.Co. "Shop Well". If State Engineer will not approve transfer of this S.5 Sec. Ft. allotment, or any part of it, then secure a new appropriation for required water at Shop Well. See tabulations under Item (3), Para­graph 1, of this letter for amount required. {2) Use Shop Well to furnish water to R.R.Co. Water Softener only through existing lines. Connection from Shop Well to 24" main, including meter, should remain in place to furnish stand-by supply in event of well failure. Service from Shop Well to Water Softener will not require a pressure sys­tem or elevated tank. (Z) In event of sale of water production facilities to Water District, arrange to purchase all water re­quired for R.R.Co* facilities, with exception of Water Softener. The Railroad facilities referred to above are, as follows i Stock Yards {Old) *Power House Tank Gars Coach Hydrant R.R. Rooming House Hew Stock Yards ?» Includes service to Consumption During 1951 jallosai 1,856,T O T 13,259,500 4,259,700 7,617,900 2,549,200 92,100 - a v . Company owned houses 0.125 GFS