Skip to main content

Search the Special Collections and Archives Portal

man000174 32

Image

File
Download man000174-032.tif (image/tiff; 27.45 MB)

Information

Digital ID

man000174-032
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 <j 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 netleo la writing #¥ its intention so to do, shall have the right (a) to construct an adequate pip* llao of a capacity equal to or oxooodiag that of the existing 24-inch east iron pipe Uao and 16-inch traaslto and east iron pipe llao sfeewa oa Paid Exhibit “1-1* by broken blank and rod line# and of a type and alio to bo mutually agreed open) and la the event the parties aannot agree open the character of aald pro* posed pipe line within ninety (9©) days after aald written notion, the ease shall be oonstruetsd by Union faolfie of 39*lnoh ooneroto or pipe of a similar character* Said proposed pipe line shall be constructed in the location shown In broken rad and white lino between potato narked A end V and V and X on aald inhibit *1-1*. (b) to construct a 24-lnch pips in the loeation shown la broken red and white line between points marked X and S on inhibit *1-1* and an 8-lneh pipe line In loeation shown in broken rod and white linos between points marked ¥ and B on Exhibit *1-1% it being understood that mists ths parties ana agree m the type of aald et-lash and 8-insh pips lias* within ninsty (9©) days aftsr sash wrlttso notlss, Slaton Pacific shall eonstruot sash pipe lines pursuant to good engineering practise and of tho capacity herein­above msatleaed la this subparagraph (b)j - 6-