Information
Digital ID
upr000037-148
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.CAPITAL INVESTMENT IN WATER SUPPhi SYSTEM XKAMM VXmiM IM1M Structures, including Cantilever Structure, Pump Sense and Buss louse Equipment Power line from Sub-station near Booster Pump Station Grading and Excavation Roadway-Park Service Rigway to Inlet Works Causeway Mainland to Island Fencing Protective Works for pump Columns 366,122.52 23$,728.00 118,090.51 73,257.95 251,422.92 235,965.18 9,489.26 245.91 total $ 1,294,322.25 BOOSTER PUMPING- STATION Structures Equipment Grading and Excavation Reservoir 112,316.53 331,084.04 13,461.68 .. 7?,858fJtf Total 535,120.90 PRESSURE PIPE LIKE Complete from Intake to Terminal Reservoirs & Terminal Reservoirs to Magnesium plant $ 2,221,131.85 TERMINAL RESERVOIRS Total I 428,551.37 WATER TREATMENT PLANT Structures $ Equipment Caustic k Brine Pipe Lines from Chlorine Plant Construction Items Added After Completion of Contract 364,748.92 288,569.08 22,713.45 jajuftsaa Total Total Capital Investment $ 687,986.44 $ 5,167,112.81 1