Skip to main content

Search the Special Collections and Archives Portal

upr000350 138

Image

File
Download upr000350-138.tif (image/tiff; 26.68 MB)

Information

Digital ID

upr000350-138
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    2 §j| relocated to point fU Pumping station will not be constructed at n location B. I understand that easement granted District under \ Sec. X paragraph (1) page 8 has been re-conveyed to Bit Oo. (e) Conatruet 14" pipe line between 3, f and Vt Pipe line constructed per District plans as approved by HR Co. (f) Construct 6* pipe line between X and 0 0 t- Constructed by LVL&W Co. prior to sale date. (g) Construct power lines between D and T and Y and V:- Jower lines constructed by District at locations not on RR Co. property. (h) S&L U ) ( J ) U ) ( 1 ) Remove pipe line between IK and LX.; Pipe H u e removed except approximately 30 ft. of pipe, valve and meter on HR Co. property near point LL. Mr .Renahaw advised that this will be removed at an early date. Remove pipe line between £1 and <r«T:- Flpe line removed. Remove power line FF to HH:- Power lines removed. Remove power, telephone and telemeter line 00 to 00;** power line, telephone and telemeter lines removed. Remove pipe lines A to E, A to K and R to H.H. (l)pipe line A to £ was removed except 60 ft. of pipe under pavement In Highway 95 which Engineer for District advises was left in place at request of Highway Commission. I recommend that no exception be taken to leaving this pipe under pavement In place. However, it might be well to secure the Highway Commission's approval. In addition to the above District removed that portion of this line from point K to angle point In line just west­erly of RR do. tracks except that portion under shop road was not removed. 1 recommend portion under read be left la